Character Bathroom Remodel: Before-During-After
This early 1900's second floor bathroom was without a shower due to the sloped ceiling, and was in need of a remodel. The project was extensive, but very easy for a professional. Converting to a shower utilizing a "period" acrylic clawfoot tub. Added upgrades included all new electrical and plumbing, new exhaust fan, a heated tile floor, and all new wainscoting. A little restoration of original trim work, medicine cabinet and built-in drawer unit gives an original look. A new custom cabinet was needed to sit above the old ductwork and old clothes chute built next to the chimney.
Watch the slideshow to see the project progress to completion.